Year | Client/Locations | Description | Project Details |
---|---|---|---|
2003 | Mobitel (Pvt)Ltd | Installation and commissioning of Battery systems at BTS sites | Testing and Installation of BTS backup batteries at 411 sites |
2004 | Tigo (Pvt)Ltd | SDH/PDH MW transmission system anstallation and commissioning | Turnkey installation and commissioning of 192 Links and NMS |
2006 | Xian NEC Radio communications equipment Co.Ltd | Marketing | New designs |
2006 | Dialog Telecom | Connectivity implimentation for a trunk route fiber project | Complete testing, Splicing, termination of main trunk route of 185Km length of laid fiber |
2007 | ZTE corporation (Srilanka | 2G system installation and commissioning | Turnkey installation of MSC (1) BSC(10) and BTS (450) |
2007 | Alcatel Srilanka | 2G system swap in a GSM Network | Survey to cutover and removal of BTS at 95 sites |
2007 | Alcatel Srilanka | PDH system and multiplexror installation and commissioning | Turnkey installation of 300 links and multiplexors |
Ongoing projects
Client/Locations | Description | Project Details | |
---|---|---|---|
Etisalat (Pvt)Ltd | installation and commissioning of MW and BTS (2G/3G) | Testing and Installation of BTS backup batteries at 411 sites | |
24X7 Fault attending islandwide | |||
Dialog Telecom | Drivetest Project 2G ,3G,Benchmarking | According to the Dialog Scope 2G and 3G drivetesting project colombo ant outstaions | |
ZTE | installation and commissioning of MW and BTS (2G/3G) | ||
Hutch | installation and commissioning of MW systems | ||
Alcatel Srilanka | installation and commissioning of MW /BTS/Multiplexror |
Overseas projects
Maldives Project | Client/Locations | Description | Project Details |
---|---|---|---|
Wataniya telecom | installation and commiissioning MW antennas | 14 links installation withing the project | |